Appendix D Problem Change Report

(Type or Print)

1. Date

2. P/ CR No

3. Originator

4. Activity Code

5. Telephone/Ext.

6. Title

7. Category: (Circle)

Plans

Design

Test Info

Concept

Code

Manuals

Requirements

DB/data file

8. Priority: (Circle)

Other _________________________

 

1

2

3

4

5

9. Problem/Change Description:


 

10. Corrective Action:


 

11. Actions Taken:

Status


 

Date


 

12. QA Sign-off


 
P/CR PREPARATION INSTRUCTIONS
  1. TITLE

    • Problem/Change Report
  1. DESCRIPTION/PURPOSE

2.1 The Problem/Change Report (P/CR) shows essential data on each software problem/change detected . It also shows errors on omi ssions in documentation. Sufficient detail of the problem shall be reported to enable analysis and isolation or replication if necessary.

  1. APPLICATION INTERRELATIONSHIP

3.1 P/CRs are used to record and report problems found throughout development. They are also used to report errors or omissions found in documentation. The P/CR is the basic input to the quality assurance program during the test and acceptance phase of the development effort. P/CRs on interfaces with other systems require joint resolution action.

  1. PREPARATION INSTRUCTIONS
  1. Date. The date form is prepared.
  2. P/CR Number. P/CR Number assigned for control purposes.
  3. Originator. Printed name of person originating the P/CR form.
  4. Activity Code. The activity and code name or number of individual originating the P/CR form.
  5. Telephone/Ext. Originator's office telephone number, and extension (if applicable ).
  6. Title. Name used to identify problem/change.
  7. Category. Circle appropriate category associated with problem/change being reported.

    Categories:

    1. Plans “ One of the plans developed for the project
    2. Concept “ The operational concept
    3. Requirements “ The system or software requirements
    4. Design “ The design of the system or software
    5. Code “ The software code
    6. Database/data file “ A database or data file
    7. Test information “ Test plans, test descriptions, or test reports
    8. Manuals “ The user , operator, or support manuals
    9. Other “ Other software products
  8. Priority. Circle appropriate priority code, 1 “ 5.

    Priority Codes:

      1. Prevent the accomplishment of an operational or mission essential capability
      2. Jeopardize safety, security, or other requirement designated "critical"
      1. Adversely affect the accomplishment of an operational or mission-essential capability and no work-around solution is known
      2. Adversely affect technical, cost, or schedule risks to the project or to life-cycle support of the system, and no work-around solution is known
      1. Adversely affect the accomplishment of an operational or mission-essential capability but a work-around solution is known
      2. Adversely affect technical, cost, or schedule risks to the project or to life-cycle support of the system, but a work-around solution is known
      1. Result in user/operator inconvenience or annoyance but does not affect a required operational or mission-essential capability
      2. Result in inconvenience or annoyance for development or support personnel, but does not prevent the accomplishment of those responsibilities
    1. Any other effect
  9. Problem/Change Description. Write a description of the problem/ change. Develop a word picture of events leading up to the problem. Structure statements so that the programmer/ test analyst can duplicate the situation. Cite equipment being used, unusual con .guration, etc. Indicate consoles on line, modes, etc., if applicable. If continuation sheets are required, .ll in page _____ of _______ at the top of the P/CR form.
  10. Corrective Action: A description, by the programmer/tester, of actions taken to resolve the reported problem or to complete the requested change.
  11. Actions Taken: Enter the status/disposition and date to indicate the current status. When the status changes, line out the old status and date and enter the appropriate new status and date.
  12. QA Sign-off. Signature by designated quality assurance (QA) organization member authorizing implementation of the corrective change(s) and certifying the correctness and completeness of the change(s).




Software Configuration Management
Software Configuration Management
ISBN: 0849319765
EAN: 2147483647
Year: 2006
Pages: 235
Authors: Jessica Keyes

Flylib.com © 2008-2020.
If you may any questions please contact us: flylib@qtcs.net