Unified Process: Construction Phase and Fifth Iteration |
The fifth iteration of the construction phase is an extension of the existing GDI+ features that were implemented in the preceding iteration. For that reason, the deliverables are similar to the ones described in Chapter 6.
The go/no-go criteria for this iteration are essentially the same as the ones described in Chapter 6. The only difference is that the deliverables reflect the features that need to be implemented in this iteration. Here is the list of deliverables:
Even though this iteration is a continuation of the implementation in Chapter 6, the project must go through all workflows of the Unified Process. Therefore, we start with the requirements refinement.
Introducing .NET
Introducing Software Engineering
A .NET Prototype
Project Planning
The Photo Editor Application
GDI+ Graphics Extensions
Advanced GDI+ Operations
Dynamic Loading of Components
Accessing System Resources
Performance Optimization, Multithreading, and Profiling
Building the Web Application with ASP.NET
Security and Database Access
Product Release