To continue our practice of builds and transitions, let's move to the next slide. Pie charts can also be animated to reveal one slice of the pie at a time.
1. | Select slide 5 in the slide organizer.
![](/books/1/138/1/html/2/images/04_51.jpg) |
2. | Select the chart in the canvas. Then select the Chart Inspector.
|
3. | In the Chart Type menu, choose the 3D pie chart option at the bottom.
![](/books/1/138/1/html/2/images/04_52.jpg) The chart is rendered in 3D, but it is small and needs more colors to better show details.
|
| |
4. | While holding down the Shift key, grab the upper-right corner of the pie chart and drag toward the upper-right corner of your screen. Release the mouse button when the pie chart is large enough to fill the empty area at the bottom of the slide.
|
5. | In the Chart Inspector, click 3D Scene and drag the 3D Rotation Angle wheel adjust the viewing angle to taste.
|
6. | Increase the depth of the chart by dragging the Chart Depth slider to the right.
![](/books/1/138/1/html/2/images/04_54.jpg) |
| |
7. | Click Series in the Chart Inspector.
You now need to add a legend to the chart to help identify the data in the chart.
|
8. | Select the Show Legend check box.
|
9. | Position the legend on the left of the screen.
|
10. | Open the Font panel and change the legend font to Arial Bold to match other slides. Set the point size to 24.
![](/books/1/138/1/html/2/images/04_55.jpg) |
11. | Select the chart; then open the Data Point Settings menu in the Data Point Label area and deselect the Show Series Name option.
|
12. | Select the Graphic Inspector.
|
13. | Click the pie wedge next to 16%.
|
14. | Click the Fill color well to open the Colors window.
|
| |
15. | Click the Crayons tab to access preset colors and change the color to Maraschino.
![](/books/1/138/1/html/2/images/04_56.jpg) |
16. | Continue changing colors for the other wedges in the pie chart. Close the Colors window when you've changed them all.
![](/books/1/138/1/html/2/images/04_57.jpg) |
| |
17. | In the Build Inspector, click Build In. Then choose the following options to create a build animation for the pie chart:
Effect: Scale Direction: Up Delivery: By Wedge Duration: 1.00 s ![](/books/1/138/1/html/2/images/04_58.jpg) |
18. | Click the More Options button.
|
19. | In the Build Order list, select Other Wedges.
|
20. | From the Start Build menu, choose Automatically after prior build.
|
| |
21. | For Delay, choose 0.5 s.
![](/books/1/138/1/html/2/images/04_59.jpg) |
22. | Select the Slide Inspector and click the Transition tab. Then choose the following options:
|
23. | Press Command-S to save your document.
|