9.5 Performing an unscheduled backup

monitoring and managing microsoft exchange 2000 server
Chapter 9 - Backup and Recovery Operations
Monitoring and Managing Microsoft Exchange 2000 Server
by Mike Daugherty  
Digital Press 2001
 

9.7 Modifying scheduled backups

You can use the following procedure to modify a scheduled backup job:

  1. Start the Backup process from the Windows 2000 Start menu by selecting Programs   Accessories   System Tools   Schedule Tasks (Figure 9.16).

    click to expand
    Figure 9.16: The Scheduled Tasks dialog box

  2. Double-click a scheduled job to view details about the job.

  3. The Run field contains the command that will be executed to perform the backup (Figure 9.17). The Run as field contains the security context under which the backup job will be run.

    click to expand
    Figure 9.17: The Task tab

  4. Select the Schedule tab to view details about the backup job schedule (Figure 9.18).

    click to expand
    Figure 9.18: The Schedule tab

  5. You can use the Schedule tab to change the backup schedule. You can perform the backup just once, daily, weekly on selected days, or monthly on selected days of the month. For each of these options, you can specify the time when the backup should start. Optionally, you can select to perform the backup each time the system starts up, each time you logon to the system, or whenever the system is idle for a specified number of minutes.

 


Monitoring and Managing Microsoft Exchange 2000 Server
Monitoring and Managing Microsoft Exchange 2000 Server (HP Technologies)