Configuring shared disk storage devices

 < Day Day Up > 



Disk storage must be configured between both nodes. Both nodes must be able to mount the file system(s) in the same location. This file system is a non-concurrent volume because IBM Tivoli Workload Scheduler has no way of properly working with "Raw File Systems".

Note 

Testing of disk storage can be done (as root) by issuing the commands:

  • varyonvg IBM Tivoli Workload Schedulingvg, mount /opt/tws

  • umount /opt/tws, varyoffvg twsvg



 < Day Day Up > 



High Availability Scenarios with IBM Tivoli Workload Scheduler and IBM Tivoli Framework
High Availability Scenarios With IBM Tivoli Workload Scheduler And IBM Tivoli Framework
ISBN: 0738498874
EAN: 2147483647
Year: 2003
Pages: 92
Authors: IBM Redbooks

flylib.com © 2008-2017.
If you may any questions please contact us: flylib@qtcs.net