| < Day Day Up > |
|
During this process the organization has to make a list of benefits that this technology will provide. This should be obtained not by mere theoretical means, but using prototyping and simulating methods. These prototypes and simulations should validate from all venues including:
Current application architecture
Current database structure
Future database structure
Future application architecture
Expanded business
Increased users
Failover
Scalability
Manageability
Recoverability
Maintainability
All the possible reasons as to why this specific technology was selected should be examined to collect statistics that could be used in the costing model.
Before determining the benefits and the cost to obtain these benefits, it is important that a determination be made as to the time frame over which these are to be realized. Once these benefits, which are also called intangible benefits, have been validated and all the business requirements have been satisfied from the simulation or prototyping model, the next step is to arrive at the cost of implementing such a solution.
A costing model that determines the cost benefits over a certain number of years should be prepared, as shown in Table 11.1.
Costs and Benefits | Year 0 | Year 1 | Year 2 | Year 3 | Year 4 |
---|---|---|---|---|---|
Software cost | |||||
Implementation cost | |||||
Training cost | |||||
Recurring maintenance cost | |||||
Increased speed of activity | |||||
Improved management | |||||
Saved time in updating data | |||||
Error reduction | |||||
Increased flexibility | |||||
Increased availability | |||||
Increased scalability | |||||
Increased manageability | |||||
Hardware cost | |||||
O/S training cost | |||||
Recurring maintenance cost | |||||
Improved management | |||||
Increased flexibility | |||||
Increased availability | |||||
Increased scalability | |||||
Increased manageability |
It should be noted that all the benefits that have been validated via prototyping and simulation should be spread over a span of five years. This cost is compared against the cost of the product and its implementation, basically the amount of money spent during year 0.
Once the cost-benefit analysis is completed and the results of analysis provide an indication that the entire migration process would be favorable to the enterprise, the next step is to start preparing and planning on the actual migration itself.
| < Day Day Up > |
|