|
| < Day Day Up > |
|
The following sections provide the planning worksheets for CSM.
| Hostname and domain | |
|---|---|
| Hostname | |
| Domain name | |
| Gateway | |
| DNS 1 | |
| DNS 2 | |
| DNS 3 | |
| Public VLAN | |
|---|---|
| IP address | |
| Subnet address | |
| Cluster VLAN | |
|---|---|
| IP address | |
| Subnet address | |
| Management VLAN | |
|---|---|
| IP address | |
| Subnet address | |
| Other VLAN (Myrinet, Gigabit, and so on) | |
|---|---|
| IP address | |
| Subnet address | |
| Hostname | IP address | MAC address |
|---|---|---|
| Hostname | HW ControlPoint | Power method | HWControl NodeId | Console server name | Console server number | Console method | Console PortNum | HWType | InstallMethod |
|---|---|---|---|---|---|---|---|---|---|
| Hostname | Install CSMVersion | Install OSName | Install Distribution Name | Install Distribution Version | InstallPKG Architecture |
|---|---|---|---|---|---|
|
| < Day Day Up > |
|