Chapter 2: Project Management in a CM Environment

Table 2.1: Typical CM Plan
Table 2.2: Typical Schedule
Table 2.3: Textual WBS

Chapter 3: The DoD CM Process Model

Table 3.1: Implementation of "Global" Government CM Management Activity

Chapter 4: Configuration Identification

Table 4.1: Configuration Identification Process Evaluation Checklist

Chapter 5: Configuration Control

Table 5.1: ECP Components

Chapter 7: A Practical Approach to Documentation and Configuration Status Accounting

Table 7.1: Typical Status Accounting Information across Product Life Cycle
Table 7.2: Visconti's Four-Level Documentation Maturity Model
Table 7.3: Key Practices and Sub-practices
Table 7.4: A Sample Use Case
Table 7.5: Data Dictionary Excerpt
Table 7.6: Sample Program Comments
Table 7.7: User Tutorial in Table Format

Chapter 8: Configuration Verification and Audit

Table 8.1: Audit Checklists

Chapter 9: A Practical Approach to Configuration Verification and Audit

Table 9.1: Thorough Test Plan
Table 9.2: Sample Test Case

Chapter 12: Configuration Management and Software Engineering Standards Reference

Table 12.1: IEEE Software Engineering Standards Summary
Table 12.2: ISO 9000 Family of Standards
Table 12.3: ISO Software Engineering Standards Summary

Chapter 14: CM Automation

Table 14.1: CM Tools Compiled by Students

Appendix A: Project Plan

Table A1: Process-Based Estimation Table
Table A2: LOC-Based Estimation
Table A3: COCOMO II Formula
Table A4: Risks Table (sorted)
Table A5: Deliverables and Milestones

Appendix D: Problem Change Report

P/CR PREPARATION INSTRUCTIONS

Appendix J: Document Change Request (DCR)

DOCUMENT CHANGE REQUEST (DCR)

Appendix K: Problem/Change Report

PROBLEM/CHANGE REPORT
P/CR PREPARATION INSTRUCTIONS

Appendix P: Project Statement of Work

<APPLICATION NAME > Release ?? Issues Log

Appendix S: Sample Maintenance Plan

MAINTENANCE LOG DETAIL.S STATUS INFORMATION

Appendix T: Software Configuration Management Plan (SCMP)

Software Configuration Management Plan (SCMP) for [System Title]
Table T1: CSCI Nomenclature/Identification
Table T2: SCM Milestones
Table T3: Baseline Change Process
Table T4: Explanation of Priorities
Table T5: Categories Used for Classifying Problems in Software Products
DOCUMENT CHANGE REQUEST

Appendix V: Functional Configuration Audit (FCA) Checklist

Functional Configuration Audit (FCA) Checklist

Appendix W: Physical Configuration Audit (PCA) Checklist

Physical Configuration Audit (PCA) Checklist

Appendix X: SCM Guidance for Achieving the "Repeatable" Level on the Software

Briefing Evaluation Check Sheet