Prestaging: Backbone Router Configuration

 <  Free Open Study  >  

Equipment List

  • One Frame Relay switch: four serial ports

  • One access server/backbone router: eight asynchronous interfaces, one Ethernet port

  • Two lab routers: one Ethernet, two serial interfaces

  • Three lab routers: one Token Ring, two serial interfaces

  • One lab router: two Ethernet ports, one Token Ring port

  • Three Ethernet hubs, four Token Ring hubs/MAUs

  • The hubs and MAUs may be substituted for a Catalyst 5000 with the appropriate number of ports. This lab is designed to be performed without any Catalyst switches. It is the only lab that does not require a switch.

 <  Free Open Study  >  


CCIE Practical Studies, Volume I
CCIE Practical Studies, Volume I
ISBN: 1587200023
EAN: 2147483647
Year: 2001
Pages: 283
Authors: Karl Solie

flylib.com © 2008-2017.
If you may any questions please contact us: flylib@qtcs.net