The goal for a Build Track is to build the various aspects of a solution in accordance with Plan Track deliverables (e.g., designs, plans, schedules, requirements). This involves developing solution features and components as well as completing the deliverables and other elements of a solution. Testing performed during this track either drives or supports construction to verify that what is built is in accordance with what was specified. Other testing objectives during a Build Track include exposing issues, uncovering design flaws, and identifying unexpected behaviors. Making sure a solution meets stakeholder expectations, usability assessments, and other types of testing are covered as part of a Stabilize Track. |