The breakeven point of using the Software Inspection Process to help produce 10,000 lines of code is $133,751. This is obtained by dividing the special costs of $82,073 by one less the total life cycle cost of 17,425 hours. The result is divided by 45,100 hours.
The breakeven point of using the Personal Software Process SM to help produce 10,000 lines of code is $106,545. This is obtained by dividing the special costs of $105,600 by one less the total life cycle cost of 400 hours. The result is divided by 45,100 hours.
The breakeven point of using the Team Software Process SM to help produce 10,000 lines of code is $154,160. This is obtained by dividing the special costs of $148,400 by one less the total life cycle cost of 1,685 hours. The result is divided by 45,100 hours.
The breakeven point of using the Software Capability Maturity Model is $464,616. This is obtained by dividing the special costs of $311,433 by one less the total life cycle cost of 14,869 hours. The result is divided by 45,100 hours.
The breakeven point of using ISO 9001 to help produce 10,000 lines of code is $1,369,206. This is obtained by dividing the special costs of $173,000 by one less the total life cycle cost of 39,402 hours. The result is divided by 45,100 hours.
The breakeven point of using Capability Maturity Model Integration to help produce 10,000 lines of code is $1,653,332. This is obtained by dividing the special costs of $1,108,233 by one less the total life cycle cost of 14,869 hours. The result is divided by 45,100 hours. Table 43 illustrates the analysis of breakeven point.
SPI Method | Breakeven Point | Normalized |
---|---|---|
Inspection | $133,751 | 0.98 |
Personal Software Process SM | $106,545 | 1.00 |
Team Software Process SM | $154,160 | 0.97 |
Software Capability Maturity Model | $464,616 | 0.78 |
ISO 9001 | $1,369,206 | 0.24 |
Capability Maturity Model Integration | $1,653,332 | 0.06 |
The SPI method with the lowest breakeven point is the Personal Software Process SM at $106,545. The SPI method with the highest breakeven point is Capability Maturity Model Integration at $1,653,332. The Personal Software Process SM , Software Inspection Process, and Team Software Process SM have the lowest breakeven points. They are $106,545, $133,751, and $154,160, respectively.
On a normalized scale, the Personal Software Process SM has the lowest breakeven point. The Software Inspection Process and Team Software Process SM have low breakeven points too. Capability Maturity Model Integration has the highest breakeven point on a normalized scale.