| < Day Day Up > |
|
A person's willingness to accept risk.
A change that positively impacts either the scope, schedule, or cost of a project without adversely impacting the other two aspects.
The difference between what was planned and what was experienced; typically used for costs and schedules.
The difference between the BAC and the EAC; its formula is VAC= BAC-EAC
| < Day Day Up > |
|