< Day Day Up > |
[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O] [P] [Q] [R] [S] [T] [U] [V] [W] [Z] tab 68-pin tab storage SCSI hard drives standards summary tag RAM cache 2nd tagged command queuing (TCQ) drive array tagged command queuing (TCQ) 2nd 3rd tapes backup rotation scheme 2nd full backup 2nd grandfather-father-son (GFS) 2nd 3rd partial backups 2nd tCAC TCP (Transmission Control Protocol) TCQ (tagged command queuing) drive array TCQ (tagged command queuing) 2nd 3rd technologies Array controllers 2nd accelerator 2nd automatic data recovery 2nd capacity expansion 2nd 3rd data protection 2nd 3rd disk striping 2nd drive failure protection technology 2nd DSR (Dynamic Sector Repair) 2nd hot-plug drive support 2nd 3rd logical drive expansion 2nd online spare drives 2nd 3rd online stripe-size migration performance tuning RAID-level migration 2nd stripe size optimization 2nd 3rd drive array 2nd features 2nd 3rd logical drives 2nd 3rd number or drives 2nd templates EPIC (Explicitly Parallel Instruction Computing) terminal window mode terminator power SCSI bus connectors 2nd Test Computer Server Diagnostics 2nd TFT (thin film transistor) HP racks thermal plan customer considerations thermal power components thin film transistor (TFT) HP racks third-party drives SCSI implementation third-party integration customer consideration threads scheduling 2nd tightly coupled architectures multiprocessor server timing PCI bus versus PCI-X bus topologies Fibre Channel 2nd arbitrated 2nd switched fabric 2nd 3rd 4th 5th 6th topology Fibre Channel tRAC transactions SCSI bus cables 2nd 3rd 4th connectors 2nd 3rd 4th disconnect and reconnect 2nd electrical signaling systems 2nd 3rd 4th 5th 6th 7th 8th 9th 10th negotiation 2nd 3rd tagged command queuing (TCQ) 2nd 3rd transfer cycles data Transmission Control Protocol (TCP) triple-peer I/O buses troubleshooting Enhanced Integrated Management Display Service Integrated Management Display (IMD) 2nd Integrated Management Display Utility 2nd Integrated Management Log (IML) 2nd Integrated Management Log Viewer 2nd Maintenance and Service Guides (MSGs) memory 2nd 3rd methodology 2nd data collection 2nd 3rd 4th develop action plan 2nd evaluate results evaluating data execute action plan preventive measures implementation 2nd networks 2nd Gigabit Ethernet 2nd 3rd 4th Network Configuration Utility 7 2nd Network Interface Performance object Network Monitor agent 2nd subsystem tuning 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st normal operation assessment 2nd PartSurfer Service Parts Information tool 2nd processors 2nd 3rd 4th resolving software issues 2nd creating software repository 2nd 3rd 4th deployment options 2nd maintenance architecture 2nd 3rd 4th 5th 6th 7th 8th 9th maintenance strategies 2nd management considerations 2nd operating system requirements PCN (product change notification) 2nd Softpacks 2nd SCSI hard drives 2nd Server Diagnostics diagnostic tests 2nd 3rd Test Computer 2nd server installation 2nd 3rd failed SmartStart installation 2nd storage 2nd 3rd subsystems 2nd upgrades 2nd tunneling Fibre Channel 2nd |
< Day Day Up > |