Adams, L., Measuring by Comparison, Quality , May 2001 , pp. 32 “34.
Allen, M.J. and Yen, M., Introduction to Measurement Theory , Wadsworth, Belmont, CA, 1979 .
Anon., Statistics Roundtable: Statistical Gymnastics Revisited, Quality Progress , Feb. 1999 , pp. 84 “94.
Anon., Statistical thinking and its contribution to total quality, The American Statistician , 44, 116 “121, 1990 .
Atkinson, H., Hamburg, J., and Ittner, C., Linking Quality to Profits: Quality Based Cost Management , Quality Press, Milwaukee, 1994 .
Aubrey, C., Six Sigma Creates Success in Service Sector, QFD and Design for Six Sigma, Proceedings 45th EOQ Congress 2001, Instanbul, Sept. 20, 2001 .
Balasubramanian, R., Concurrent Engineering ” A Powerful Enabler of Supply Chain Management, Quality Progress , June 2001 , pp. 47 “54.
Barnes, E.B. and Mohanty, G.P., Tolerance allocation methodology for manufacturing, 1996 SAE Reliability, Maintainability, Supportability and Logistics Conferences and Workshop, Proceedings of the 8th Annual SAE RMS Workshop , 1996 , pp. 49 “54.
Bongiorno, J., Improving FMEAs, Quality Digest , Oct. 2000 , pp. 37 “40.
Boyce, W.E. and DiPrima, R.C., Elementary Differential Equations and Boundary Value Problems , 7th ed, Wiley, New York, 2000 .
Brauer, J.R., Finite Element Analysis , Marcel Dekker, New York, 1998 .
Breyfogle, F.W., Implementing Six Sigma: Smarter Solutions Using Statistical Methods , Wiley-Interscience, New York, 1999 .
Breyfogle, F.W., Statistical Methods for Testing, Development and Manufacturing , Wiley-Interscience, New York, 1992 .
Britz, G. et al., Statistical Thinking, Special Publication, ASQC Statistics Division, Spring 1996 , pp. 2 “23.
Burke, R.J. and Maier, N.R.F., Attempts to predict success on an insight problem, Psychological Reports , 17, 303 “310, 1965 .
Campanella, J., Ed., Principles of Quality Costs: Principles, Implementation, and Use , 3rd ed., Quality Press, Milwaukee, 1999 .
Chen, I.J. et al., Quality Managers and the Successful Management of Quality: An Insight, Quality Management Journal , 2000 , pp. 40 “54.
Cone, G., Six Sigma: Black Belt Training for Quality, Automotive Excellence , Fall 1998 , pp. 10 “14.
Daniels, S.E., Product Safety and Reliability: The Failures, SUV Rollovers Put Quality on Trial, Quality Progress , Dec. 2000 , pp. 30 “48.
Daniels, S.E. and Hagen, M.R., Making the Pitch in the Executive Suite, Quality Progress , Apr. 1999, pp. 30 “48.
Davenport, T.H., Process Innovation: Reengineering Work Through Information Technology , Harvard Business School Press, Boston, 1993 .
De Pablos, L.A., Six Sigma Quality Metric vs. Taguchi Loss Function, QFD and Design for Six Sigma, Proceedings 45th EOQ Congress 2001, Instanbul, Sept. 20, 2001 .
Deleryd, M., Deltin, J., and Klefsjo, B., Critical factors for successful implementation of process capability studies, Quality Management Journal , 6 (1), 40 “59, 1999 .
Denton, K., The Tool Box for the Mind: Finding and Implementing Creative Solutions in the Workplace , Quality Press, Milwaukee, 1999 .
Dimitriades, Z.S., Empowerment in total quality: designing and implementing effective employee decision-making strategies, Quality Management Journal , 8 (2), 19 “28, 2001 .
Dodson, B., Weibull Analysis , Quality Press, Milwaukee, 1995 .
Dovich, R.A., Reliability Statistics , Quality Press, Milwaukee, 1990 .
Draman, R.H. and Chakravorty, S.S., An Evaluation of Quality Improvement Project Selection Alternatives, Quality Management Journal , 2000 , pp. 58 “73.
Dusharme, D., Gage Use and Abuse: A Guide to Common Gage Misuse, Quality Digest , Feb. 1999 , pp. 30 “33.
Field, J.M., Beyond design: implementing effective production work teams , Quality Management Journal , 8 (2), 29 “43, 2001 .
Fleischer, M. and Liker, J.K., Concurrent Engineering Effectiveness , Hanser Gardner, Cincinnati, 1997 .
Finn, G., Building Quality into Design Engineering, Quality Digest , Feb. 2000 , pp. 35 “38.
Fraenkel, J., Wallen, N., and Sawin, E.I., Visual Statistics. A Conceptual Primer , Allyn & Bacon, Needham Heights, MA, 1999 .
Fuller, W.A., Measurement Error Models , Wiley, New York, 1987 .
Gebrael, M.G., Markov Modeling as a Reliability Tool, 1996 SAE Reliability, Maintainability, Supportability and Logistics Conferences and Workshop, Proceedings of the 8th Annual SAE RMS Workshop , 1996 , pp. 37 “44.
Genest, D.H., Improving Measurement System Compatibility, Quality Digest , Apr. 2001 , pp. 35 “40.
Ghiselin, B., Ed., The Creative Process , University of California Press, Berkeley, 1952 .
Goldratt, E., Critical Chain , North River Press, Great Barrington, MA, 1998 .
Goldratt, E., Essays on the Theory of Constraints , North River Press, Great Barrington, MA, 1998 .
Goldratt, E., Necessary But Not Sufficient , North River Press, Great Barrington, MA, 2000 .
Goodden, R., How a Good Quality Management System Can Limit Lawsuits, Quality Progress , June 2001 , pp. 55 “59.
Goodenow, W.H., How to Become a Master Black Belt Organization Without Six Sigma, Quality in Manufacturing , Jan./Feb. 2001 , pp. 16 “18.
Gorsuch, R.L., Factor Analysis , W.B. Saunders, Philadelphia, 1974 .
Griffith, G.K., Statistical Process Control Methods for Long and Short Run , 2nd ed., Quality Press, Milwaukee, 1996 .
Hammer, M., Beyond Reengineering ” How the Process Centered Organization is Changing Our Work and Our Lives , Harper Business, New York, 1996 .
Hammer, M. and Champy, J., Reengineering the Corporation. A Manifesto for Business Revolution , Harper Business, New York, 1993 .
Harrington, H.J., Project Management: It's a More Important Tool than Six Sigma, Quality Digest , June 2000 , p. 20.
Harrington, H.J., Business Process Improvement: The Breakthrough Strategy for Total Quality, Productivity, and Competitiveness , McGraw-Hill, New York, 1991 .
Heil, G., Parker, T., and Stephens, D.C., One Size Fits One. Building Relationships One Customer and One Employee at a Time , Wiley, New York, 1999 .
Heiser, D.R. and Schikora, P., Flowcharting with Excel, Quality Management Journal , 2001 , pp. 26 “35.
Hoerl, R.W., Six Sigma and the Future of the Quality Profession, Quality Progress , June 1998 , pp. 35 “44.
Holmes, D.S. and Mergen, A.E., Building an Acceptance Chart., Quality Digest , June 2000 , pp. 35 “36.
Holpp, L., Managing Teams , McGraw-Hill, New York, 1999 .
Hoyer, R.W. and Hoyer, B.B.Y., What Is Quality? Quality Progress , July 2001 , pp. 52 “62.
Hunter, J.S., Metrics for Uncertainty: A Look at Probability, Evidence and a Seldom Used Additive Metric, Quality Progress , Dec. 2000 , pp. 72 “73.
Imparato, N. and Harari, O., Jumping the Curve. Innovation And Strategic Choice in an Age of Transition , Jossey-Bass, San Francisco, 1994 .
Ireson, W.G., Coombs, C.F., and Moss, R.Y., Handbook of Reliability Engineering and Management , 2nd ed., Quality Press, Milwaukee, 1996 .
Isaacson, J. and Chambers, W., An Introduction to Optical Measurement, Quality Digest , Oct. 2000 , pp. 28 “32.
Janov, J., The Inventive Organization. Hope and Daring at Work , Jossey-Bass, San Francisco, 1994 .
Kales, P., Reliability: For Technology, Engineering, and Management , Quality Press, Milwaukee, 1998 .
Kalfut, M., Riding the Benchmark, Technology Century , Dec. 1997/Jan. 1998, pp. 30 “31.
Kall, J., Manufacturing Execution Systems: Leveraging Data for Competitive Advantage (Part I), Quality Digest , Aug. 1999 , pp. 31 “34.
Kall, J., Manufacturing Execution Systems: Leveraging Data for Competitive Advantage (Part II), Quality Digest , Sept. 1999 , pp. 31 “33.
Kanyamibwa, F., Christy, D.P., and Fong, D.K.H., Variable selection in product design, Quality Management Journal , 8 (1), 62 “79, 2001 .
Kaplan, R.S. and Norton, D.P., The Balanced Scorecard , Harvard Business School Press, Boston, 1996 .
Kapur, K.C. and Lamberson., L.R., Reliability in Engineering Design , Wiley, New York, 1977 .
Kay, M., Applying Six Sigma in a Public Service Organization, QFD and Design for Six Sigma, Proceedings 45th EOQ Congress 2001, Instanbul, Sept. 20, 2001 .
Kelada, J.N., Intergrading Reengineering with Total Quality , Quality Press, Milwaukee, 1996 .
Kelly, C. and Kachatorian. L., Robust Design for Six Sigma Manufacturability, 1996 SAE Reliability, Maintainability, Supportability and Logistics Conferences and Workshop, Proceedings of the 8th Annual SAE RMS Workshop , 1996 , pp. 25 “28.
Kelly, L. and Morath, P., How Do You Know the Change Worked? Quality Progress , July 2001 , pp. 68 “74.
Kish, L., Some statistical problems in research design, American Sociological Review , 24, 328 “338, 1959 .
Kish, F.J., Utilizing value engineering as a problem solving management tool, SAE National Combined Farm Construction and Industrial Machinery, Powerplant, and Transportation Meetings, Society of Automotive Engineers, Milwaukee, Sept. 9 “12, 1968 , paper 680567.
Knouse, S.B. and Strutton, H.D., Getting Employee Buy-In to Quality Management, Quality Progress , Apr. 1999 , pp. 61 “64.
Krishnamoorthi, K.S., Reliability Methods for Engineers , Quality Press, Milwaukee, 1992 .
Kume, H., Statistical Methods for Quality Improvement , The Association for Overseas Technical Scholarship, Tokyo, 1985 .
Lathin, D. and Mitchell, R., Learning from Mistakes, Quality Progress , June 2001 , pp. 39 “46.
Lehmann, E.L., Testing Statistical Hypotheses , Wiley, New York, 1986 .
Lepi, S.M., Practical Guide to Finite Elements , Marcel Dekker. New York, 1998 .
Levinson, W.A., How to Design Attribute Sample Plans on a Computer, Quality Digest , July 1999 , pp. 45 “47.
Liberatore, R., Teaching the Role of SPC in Industrial Statistics, Quality Progress , July 2001 , pp. 89 “94.
Livingston, S., Creating the Right Atmosphere: Setting the Stage for Innovative Thinking in Ideation Sessions, Quirk's Marketing Research Review , May 2001 , pp. 32 “39.
Maier, N.R.F., Problem Solving and Creativity in Individuals and Groups , Brooks/Cole Publishing Co., Wadsworth Publishing Co., Belmont, CA, 1970 .
Marash, S.A., A New Look at Six Sigma, Quality Digest , Mar. 1999 , p. 18.
Mazur, G., QFD and Design for Six Sigma, Proceedings 45th EOQ Congress 2001, Instanbul, Sept. 20, 2001 .
McLean, H.W., HALT, HASS and HASA Explained: Accelerated Reliability Techniques , Quality Press, Milwaukee, 2000 .
Meeker, W.Q., Doganaksy, N., and Hahn, G.J., Using Degradation Data for Product Reliability Analysis, Quality Progress , June 2001 , pp. 60 “65.
Mitchell, R.H., Process Capability Indices, ASQ Statistics Division Newsletter , Winter 1999 , pp. 16 “20.
Mitchell, E., Web-Based APQP Keeps Everyone Connected, Quality , July 2001 , pp. 40 “44.
Modares, M., Kaminski, M., and Krivtsov, V., Reliability Engineering and Risk Analysis: A Practical Guide , Marcel Dekker, New York, 1999 .
Myers, R.E. and Torrance, E.P., Invitations to Thinking and Doing , Ginn, Boston, 1964 .
O'Connell, V., Advertising, Wall Street Journal , Nov. 27, 2000 , p. B21.
O'Conor, P.D.T., Practical Reliability Engineering , 3rd ed., Quality Press, Milwaukee, 1995 .
Orme, B., Assessing the Monetary Value of Attribute Levels with Conjoint Analysis: Warnings and Suggestions, Quirk's Marketing Research Review , May 2001 , pp. 16, 44 “47
Osborn, A.F., Applied Imagination , 3rd ed., Scribener, New York, 1963 .
Paul, L.G., Outsourcing and Analyzing the Value Proposition, CFO , Aug. 2001 , pp. 60 “61.
Peterman, M., Lean Manufacturing Techniques Support the Quest for Quality, Quality in Manufacturing , Jan./Feb. 2001 , pp. 24 “25.
Peterman, M., Simulation Nation: Process Simulation Is Key in a Lean Manufacturing Company Hungering for Big Results, Quality Digest , May 2000 , pp. 39 “42.
Porter, A. and Adams, L., Quality Begins with Good Data, Quality , May 2001 , pp. 32 “34.
Porter, M.E., Competitive Advantage: Creating and Sustaining Superior Performance , Free Press, New York, 1985 .
Pylipow, P.E., Can It Be This Easy? You Can Alter Drawing Practices to Achieve Six Sigma, But Only if You Understand All the Implications, Quality Progress , July 2001 , pp. 139 “140.
Pyzdek, T., Considering Constraints, Quality Digest , June 2000 , p. 22.
Pyzdek, T., The 1.5 Sigma Shift, Quality Digest , May 2001 , p. 22.
Quesenberry, C., Statistical Gymnastics, Quality Progress , Sept. 1998 , pp. 75 “78.
Rosen, R. and Digh, P., Developing globally literate leaders , T+D , 55 (5), 70 “83, 2001 .
Salzman, R.H. and Liddy, R.G., Product Life Predictions from Warranty Data, 1996 SAE Reliability, Maintainability, Supportability and Logistics Conferences and Workshop, Proceedings of the 8th Annual SAE RMS Workshop , 1996 , pp. 45 “48.
Schuetz, G., Gaged and Confused, Quality Digest , May 2001 , pp. 44 “47.
Schwarz, F.C., Managing Progress Through Value Engineering, SAE National Combined Farm Construction and Industrial Machinery, Powerplant, and Transportation Meetings, Society of Automotive Engineers. Milwaukee, Sept. 9 “12, 1968 , paper 680566.
Slater, R., Jack Welch and the GE Way: Management Insights and Leadership Secrets of the Legendary CEO , McGraw-Hill, New York, 1999 .
Smith, D., How Good Are Your Data? Quality Digest , June 2000 , pp. 50 “51.
Stalk, G., Jr. and Hout, T.M., Competing Against Time: How Time-Based Competition is Reshaping Global Markets , Free Press, New York, 1990 .
Stamatis, D.H., The Nuts and Bolts of Reengineering , Paton Press, Red Bluff, CA, 1998 .
Stamatis, D.H., TQM Engineering Handbook , Marcel Dekker, New York, 1997 .
Stasiowski, F.A. and Burstein, D., Total Quality Management for the Design Firm: How to Improve Quality, Increase Sales, and Reduce Costs , Wiley, New York, 1993 .
Steel, J., Truth, Lies and Advertising , Wiley, New York, 1998 .
Steele, J. M., Applied Finite Element Modeling: Practical Problem Solving for Engineers , Marcel Dekker, New York, 1998 .
Stein, P., All You Ever Wanted to Know About Resolution, Quality Progress , July 2001 , pp. 141 “142.
Stevens, D.P., A stochastic approach for analyzing for analyzing product tolerances, Quality Engineering , 6 (3), 439 “449, 1994 .
Sun, H., Comparing quality management practices in the manufacturing and service industries: learning opportunities, Quality Management Journal , 8 (2), 53 “71, 2001 .
Subramanian, K., The System Approach: A Strategy to Survive and Succeed in the Global Economy , Hanser Gardner, Cincinnati, 2000 .
Taraschi, R., Cutting the Ties that Bind, Training and Development , Nov. 1998 , pp. 12 “14.
Tichy, N.M. and Sherman, S., Control Your Destiny or Someone Else Will: Lessons in Mastering Change ” From the Principles Jack Welch Is Using to Revolutionize GE , Harper Business, New York, 1993 .
Umble, E.J.2 and Umble, M.M., Developing Control Charts and Illustrating Type I and Type II Errors, Quality Management Journal , 2000 , pp. 23 “31.
Valance, N., Prices Without Borders? CFO , Aug. 2001 , pp. 71 “73.
Van Mieghem, T., Lessons Learned From Alexander the Great, Quality Progress , Jan. 1998 , pp. 41 “48.
Vasilash, G.S., For Robust Products, Automotive Design and Production , Aug. 2001 , p. 8.
Ward, S. How Much Data is Needed? Quality , July 2001 , pp. 26 “29.
Wearing, C. and Karl, D.P., The Importance of Following GD&T Specifications, Quality Progress , Feb. 1995 , pp. 95 “98.
Wetmore, D., The Juggling Act, Training and Development , Sept. 2000 , pp. 67 “68.
White, D.A. and Kall, J., Coherent Laser Radar: True Noncontact Three-dimensional Measurement Has Arrived, Quality Digest , Aug. 1999 , pp. 35 “38.
Whitfield, K., The Current State of Quality at Honda and Toyota, Automotive Design and Production , Aug. 2001 , pp. 50 “52.
Yilmaz, M.R. and Chatterjee, S., Six sigma beyond manufacturing ” a concept for robust management, Quality Management Journal , 7 (3), 67 “78, 2000 .