[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [L] [M] [N] [P] [R] [S] [T] [U] [V] [W] safety air quality at loading dock[safety loading] fire extinguishers safety:personnel safety: [See also emergency and hazard [safety:aaa]] security access:to data center[access:data center] Command Center equipment:security fire prevention logical access logical access;access:logical security minimizing traffic motion detectors physical access physical access;access:physical security;physical access:restrictions remote access remote management traps using Command Center[security Command Center] vandalism video cameras 2nd windows and doors security:Command Center Command Center security security:network network:security security:video cameras physical access:video cameras cameras, [See security, video cameras;video cameras, See security, video cameras] seismic activity, [See hazards, earthquakes] seismic bracing raised floors:seismic bracing shipping and receiving accessibility protection from elements site:shipping and receiving Signal Reference Grid (SRG) power:SRG recommended practices 2nd Simple Network Monitoring Protocol (SNMP) 2nd site and networking[site networking] data center area criteria expansion geographic criteria geographic location 2nd loading dock retrofitting selection 2nd structural layout 2nd structural limitations site:hazards location, [See site] site:raised floors raised floors:viability of software Aperture 2nd AutoCAD 2nd 3rd Flovent 2nd 3rd Verification Test Suites (VTS) Southern Building Code Congress International, Inc. (SBCCI) spaghetti avoiding 2nd 3rd Spaghetti on the floor staging area site:staging area videotaping in storage documenting process in staging area[storage staging] outsourcing sheds site:storage Storage Area Network (SAN) storage: contaminants contaminants:and stored items[contaminants:stored] straight jackets avoiding them sub-switches connectivity:sub-switches preconfiguring subfloor breaches 2nd 3rd 4th 5th integrity sealants and hardeners sharing subfloor: plenums [See also plenums[subfloor:aaa]] Suggested front-to-front hardware configuration (top view) Sun Management Center (SunMC) support grid raised floors:support grid support systems 2nd surge suppression surveillance systems, [See video cameras] system availability 2nd redundancies system:monitoring system:status |