[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [L] [M] [N] [P] [R] [S] [T] [U] [V] [W] raccoons self-immolating Rack Location Units (RLUs) creating definitions 2nd criteria 2nd definition naming in-feeds, determining 2nd introduction to 2nd overview power requirements 2nd supersets used to determine capacities used to determine number of electrical outlets Rack Location Units (RLUs):bandwidth requirements connectivity:bandwidth requirements Rack Location Units (RLUs):functional capacity requirements functional capacity requirements Rack Location Units (RLUs):HVAC requirements capacities: [See also Rack Location Units (RLUs)[capacities:aaa]] Rack Location Units (RLUs):physical space requirements physical space requirements space requirements, [See physical space requirements] Rack Location Units (RLUs):reverse engineering reverse engineering 2nd Rack Location Units (RLUs):weight requirements weight:rack requirements rack units (U) racks air flow patterns aisle and breaks heat load location placement racks:placement hardware racks, [See racks] Raised floor (cross-section). [THIS IS A TEMPORARY DRAWING.} raised floor tiles air flow air pressure aluminum carpeted composition construction customizations cutouts distribution graphic placement example introduction to lifters load specifications partial perforated point load poor fitting solid types weight specifications 2nd raised floor tiles:distribution tiles, panels, See raised floor tiles [See raised floor tiles] raised floor tiles:placement of raised floors:air flow raised floors air flow downward flow system graphic example height load and budget point load reasons for and against splitting up weight load static load 2nd stringers structure 2nd tile placement total floor load weight specifications 2nd raised floors:routing cables raised floors:air flow ramps raised floors:ramps weight:ramp load specifications redundancy environmental support future planning mechanical support system redundancy:HVAC HVAC:redundancy air conditioning, [See HVAC] redundancy:power power:redundancy 2nd redundancy:UPS Uninterruptible Power Supply (UPS):redundancy redundancy:utility feeds utilities:feeds Relative Humidity (RH) associated with ESD[Relative Humidity (RH) ESD] described remote management risk management analysts RLU criteria room layout |