[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [L] [M] [N] [P] [R] [S] [T] [U] [V] [W] pallet jacks Particulate Matter and Junk on the Floor patch panels density patch panels:testing verification:of cables and ports[verification:cables] PDF format philosophy design:philosophy flexibility modularity sanity scalability simplicity physical capacity physical space requirements plenums in ceiling[plenums ceiling] 2nd 3rd Point Of Distribution (POD) network:cabling:PODs connectivity:PODs verification power amount needed analyses breakers sharing upgrading cables to racks conditioning degrading influences distribution system installation placement requirements electromagnetic interference emergency disconnect for HVAC harmonic content input quality L6-30R outlets 2nd 3rd lightning problems local availability outlets overcurrent protection panels PDUs redundancy 2nd single- and three-phase wiring testing voltage spikes Power Distribution Units (PDUs) meeting code power:backup generators power:generators generators, [See power, generators] power:cabling, breakers to outlets cabling:in plenum[cabling:plenum] power:distribution system:design design:power distribution system power:failure rate power: [See also bonding and grounding [power:aaa]] power:generators:redundancy redundancy:power generators power:Hubble connectors connectors:Hubble power:noise control grounding:noise control power:requirements electrical: [See also power[electrical:aaa]] project scope viability Proper Aisle Space and Non-Continuous Rows |