index_C

 
[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [L] [M] [N] [P] [R] [S] [T] [U] [V] [W]

cable trays  
       network:routing cables  
cabling
       bundling   2nd  
       Category 5  
       correct lengths  
       from PDUs[cabling
               PDUs]  
       home runs   2nd  
       in plenum[cabling
               plenum]  
       labeling   2nd  
       multi-mode fibre  
       network
               PODs to devices  
        plenum-rated  
       routing   2nd  
       testing   2nd  
       tracing  
       verification  
cabling: color coding
       color coding:cables  
cabling:routing
       wiring:routing  
capacities  
       floor load  
       introduction to  
       load specifications
               weight:raised floor specifications  
       planning  
card readers
       security:card readers
               physical access:card readers  
Category 5,
       cabling:Category 5   [See cabling]
cipher locks
       security:cipher locks
               physical access:cipher locks  
circuit breakers  
       in PDUs[circuit breakers
               PDUs]  
cleaning  
co-location  
code
       and law[code
               law]  
       and quagmires[code
               quagmires]   2nd  
       building   2nd  
       earthquake hazards and  
       fire  
       mechanical support system and  
       Power Distribution Units (PDUs)  
       ramps, lifts and  
       SRG and  
       types  
       wireways and  
code:and engineers[code: engineers ]
       engineers:and code[engineers:code]  
code:toxic hazard
       building code,   [See code]
Command Center  
       and contaminants [Command Center
               contaminants]  
       public relations  
       reasons for  
condensers
       HVAC:condensers  
connectivity
       administrative network  
       local availability  
       network:connectivity  
       requirements  
connectors
       dongle  
       fibre  
       RJ-45  
construction
       in online data center[construction
               online]  
       isolating activity  
       materials  
contaminants
       agglomeration of  
       air dams  
       and human movement[contaminants
               human]  
       and short circuits[contaminants
               short]  
       and thermal failures[contaminants
               thermal]  
       avoiding   2nd  
       cleanings   2nd  
       effects of   2nd  
       electrostatic problems  
       exposure points  
       filtration  
       gaseous   2nd  
       in subfloor void[contaminants
               subfloor]  
       particulate   2nd  
       staging area  
       trash  
       types and sources   2nd  
contaminants:in subfloor void[contaminants:subfloor]
       plenums:contaminants in  
contractors,
       engineers:electrical   [See engineers]
Cooling Short Cycle air flow patterns  
cooling,
       HVAC:See also air flow[HVAC:aaa]   [See HVAC]
corrosion  
criteria
       essential  
       secondary  
criteria, data center   2nd  
criteria:construction
       construction:criteria   2nd  
cross-patch ports
       connectivity:cross-patch ports  

 


Enterprise Data Center Design and Methodology
Enterprise Data Center Design and Methodology
ISBN: 0130473936
EAN: 2147483647
Year: 2002
Pages: 142
Authors: Rob Snevely

flylib.com © 2008-2017.
If you may any questions please contact us: flylib@qtcs.net