Before you can run the e-procurement sample, you must register components, attach the correlation databases, and configure the BizTalk Messaging objects on the hub and supplier systems. In this scenario, both the hub and the supplier are configured on one BizTalk Server installation. In an actual production environment, the hub and the supplier would be two separate entities connected to the Internet.
Important The instructions in this sample assume that this sample and BizTalk Server 2002 are installed on the same drive.
Previous Next |