Drawing on a Gantt Chart


Project includes a Drawing toolbar with which you can draw objects directly on the chart portion of a Gantt chart. For example, if you would like to note a particular event or graphically call out a specific item, you can draw objects, such as text boxes, arrows, and other items, directly on a Gantt chart. You can also link a drawn object to either end of a Gantt bar or to a specific date on the timescale. Here’s how to choose the type of link you need:

  • Link objects to a Gantt bar when the object is specific to the task the Gantt bar represents. The object will move with the Gantt bar if the task is rescheduled.

  • Link objects to a date when the information the object refers to is date sensitive. The object will remain in the same position relative to the timescale no matter which part of the timescale is displayed.

Tip 

If the Drawing toolbar does not have the type of item you would like to add, you can add bitmap images or documents using the Object command on the Insert menu.

In this exercise, you display the Drawing toolbar and add a text box to the Custom Gantt Chart view.

1. On the View menu, point to Toolbars, and then click Drawing.

The Drawing toolbar appears.

Tip 

You can also click Drawing on the Insert menu to display the Drawing toolbar.

2. On the Drawing toolbar, click the Text Box button, and then drag a small box anywhere on the chart portion of the Custom Gantt Chart view. image from book

3. In the box that you just drew, type Film festival January 10 and 11

4. On the Format menu, point to Drawing, and then click Properties.

The Format Drawing dialog box appears.

Tip 

You can also double-click the border of the text box to view its properties.

5. Click the Line & Fill tab if it is not already selected.

6. In the Color box under the Fill label, click Yellow.

Next, you’ll attach the text box to a specific date on the timescale.

7. Click the Size & Position tab.

8. Make sure that Attach To Timescale is selected, and in the Date box, type or click 1/10/08.

9. In the Vertical box under Attach To Timescale, type 2.75 (this is the number of inches below the timescale where the top of the box will be positioned), and then click OK to close the Format Drawing dialog box.

Project colors the text box yellow and positions it below the timescale near the date you specified.

10. Click in an empty area of the Gantt Chart view to unselect the text box.

image from book

Because you attached the text box to a specific date on the timescale, it will always appear near this date even if you zoom the timescale in or out or scroll the chart left or right. Had you attached the text box to a Gantt bar, it would move with the Gantt bar if the task were rescheduled. To conclude this exercise, you will hide the Drawing toolbar.

11. On the View menu, point to Toolbars, and then click Drawing.

The Drawing toolbar is hidden.




Microsoft Office Project 2007 Step by Step
MicrosoftВ® Office Project 2007 Step by Step (Step By Step (Microsoft))
ISBN: 0735623058
EAN: 2147483647
Year: 2004
Pages: 247

flylib.com © 2008-2017.
If you may any questions please contact us: flylib@qtcs.net