The ROI of using the Software Inspection Process to help produce 10,000 lines of code is 3,272%. This is obtained by dividing the adjusted benefits of $2,685,391 by the costs of $82,073 and multiplying the result by 100%.
The ROI of using the Personal Software Process SM to help produce 10,000 lines of code is 4,133%. This is obtained by dividing the adjusted benefits of $4,364,397 by the costs of $105,600 and multiplying the result by 100%.
The ROI of using the Team Software Process SM to help produce 10,000 lines of code is 2,826%. This is obtained by dividing the adjusted benefits of $4,193,096 by the costs of $148,400 and multiplying the result by 100%.
The ROI of using the Software Capability Maturity Model to help produce 10,000 lines of code is 871%. This is obtained by dividing the adjusted benefits of $2,711,631 by the costs of $311,433 and multiplying the result by 100%.
The ROI of using ISO 9001 to produce 10,000 lines of code is 229%. This is obtained by dividing the adjusted benefits of $396,841 by the costs of $173,000 and multiplying the result by 100%.
The ROI of using Capability Maturity Model Integration to help produce 10,000 lines of code is 173%. This is obtained by dividing the adjusted benefits of $1,914,831 by the costs of $1,108,233 and multiplying the result by 100%. (This assumes that the benefits are no greater than the Software Capability Maturity Model .) Table 41 illustrates the analysis of ROI.
SPI Method | ROI | Normalized |
---|---|---|
Inspection | 3,272% | 0.79 |
Personal Software Process SM | 4,133% | 1.00 |
Team Software Process SM | 2,826% | 0.68 |
Software Capability Maturity Model | 871% | 0.21 |
ISO 9001 | 229% | 0.06 |
Capability Maturity Model Integration | 173% | 0.04 |
The SPI method with the highest ROI is the Personal Software Process SM at 4,133%. The SPI method with the lowest ROI is Capability Maturity Model Integration at 173%. All of the SPI methods had an ROI above 100%, topping out with the Personal Software Process SM , Software Inspection Process, and Team Software Process SM at 4,133, 3,272, and 2,826%, respectively.
On a normalized scale, the Personal Software Process SM has the highest ROI. ISO 9001 and Capability Maturity Model Integration have the lowest ROI on a normalized scale.