index_H

 < Day Day Up >   

[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O] [P] [Q] [R] [S] [T] [U] [V] [W] [Z]

hard drives
    ATA/IDE
         ATAPI (ATA Packet Interface) 2nd
         Serial ATA 2nd 3rd
         server benefits 2nd
         standards 2nd
    drive array
         RAID 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd 33rd 34th 35th 36th 37th 38th 39th 40th 41st 42nd 43rd 44th 45th 46th 47th 48th 49th 50th
         technologies 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
     SCSI 2nd
         characteristics 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd 33rd 34th 35th 36th 37th 38th 39th 40th 41st 42nd 43rd
         new technologies 2nd 3rd 4th 5th 6th 7th 8th
         SCSI-1 2nd
         SCSI-2 2nd
         SCSI-3 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd
         standards summary 2nd
         troubleshooting 2nd
         versus parallel ATA/IDE hard drive 2nd
hard errors
     memory
hard zoning
     Fibre Channel
hardware
    backups
         installation 2nd 3rd 4th
    Fibre Channel
         Gigabit link modules 2nd
         HBAs (host bus adapters) 2nd 3rd 4th 5th 6th 7th 8th
         hub and switch selection guidelines 2nd
         hubs 2nd
         hubs versus switches
         switches 2nd 3rd 4th
     RILOE II 2nd 3rd
    upgrades
         drives 2nd
         memory 2nd 3rd
         PCI cards 2nd
         processors 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th
         removing
         troubleshooting 2nd
hardware components
     server installation 2nd 3rd 4th
         ACU 2nd
         configuring system startup 2nd
         deployment method 2nd
         essentials foundation pack 2nd
         essentials software 2nd
         ORCA 2nd 3rd
         RBSU 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th
         setup configuration flow 2nd 3rd 4th 5th 6th 7th 8th 9th
         SmartStart 2nd 3rd 4th 5th
         system and option ROMs updating 2nd 3rd
         System Erase Utility 2nd
         value packs 2nd 3rd 4th 5th
hardware-based RAID 2nd
HBAs
     (host bus adapters)
     Fibre Channel 2nd
         GBIC (Gigabit Interface Converters) 2nd 3rd 4th
         GBIC longwave (GBIC-LW)
         GBIC shortwave (GBIC-SW)
hertz
     (Hz)
heterogeneous fabric
hierarchical structures
     PCI-X bus 2nd
high-voltage differentia
     (HVD)
high-voltage differential
     SCSI bus 2nd
Highly Parallel System Architecture
     (HPSA) 2nd
home page
     system management 2nd
         point management 2nd
host bus adapters
     (HBAs)
     Fibre Channel 2nd
         GBIC (Gigabit Interface Converters) 2nd 3rd 4th
         GBIC shortwave (GBIC-SW)
         GGBIC longwave (GBIC-LW)
Hot Plug RAID Memory
     F8 chipset
Hot Plug RAID memory
     improving server availability 2nd
         basics 2nd
         hot-add/upgrade support 2nd
         hot-replace support
         memory capacity
         versus drive arrays 2nd
hot-plug controllers
     PCI bus 2nd 3rd 4th 5th 6th
hot-plug drives
     Array controller support 2nd
         LEDs
     SCSI implementation 2nd
         LEDs 2nd
         replacing 2nd
         support 2nd
hot-plug mirrored memory
     improving server availability 2nd 3rd
HP
    support
         process mixing 2nd 3rd
HP Enterprise Configurator utility 2nd 3rd 4th
HP Enterprise Network Storage Architecture
     (ENSA)
HP Rack 10000 series 2nd
HP Rack and Power Manager
HP racks 2nd
     10000 series 2nd
     HP Enterprise Configurator utility 2nd 3rd 4th
     options 2nd
         cable management 2nd
         console switches 2nd 3rd 4th 5th 6th 7th 8th 9th
         keyboards 2nd
         monitors 2nd
         shelving and stabilizing 2nd
     PDUs (power distribution units) 2nd
     service considerations 2nd
     UPS (uninterruptible power systems) 2nd
         enhanced battery management 2nd 3rd 4th 5th 6th 7th
         options 2nd 3rd 4th 5th
         Power Calculators 2nd 3rd 4th 5th 6th 7th
         power manager 2nd 3rd 4th
         service considerations 2nd 3rd
         Sizing tool 2nd
HP StorageWorks adapters
     SCSI implementation 2nd
HPSA
     (Highly Parallel System Architecture) 2nd
hubs
     Fibre Channel 2nd
         selection guidelines 2nd
         versus switches
HVD
     (high-voltage differential)
hyper-pipelined processors
hyper-threading technologies
     logical processor 2nd 3rd 4th
Hz
     (hertz)

 < Day Day Up >   


HP ProLiant Servers AIS. Official Study Guide and Desk Reference
HP ProLiant Servers AIS: Official Study Guide and Desk Reference
ISBN: 0131467174
EAN: 2147483647
Year: 2004
Pages: 278

flylib.com © 2008-2017.
If you may any questions please contact us: flylib@qtcs.net