|
Taguchi optimization methods, 189, 191
Takt times, 103
Tally sheet, 57
Target ratio percent, 83
Tata Engineering & Locomotive (India), 104
Team
building, 134, 136
communication in, 135
conflict resolution, 137–40
for FMEA, 114–18
inefficiency, 135
for process control, 65, 69
structure of, 134–35
Telephone surveys, 28, 213
TGR and TGW, 199
Theory of inventive problem-solving (TRIZ), 157, 184
Theta, 205–6
Throughput yield, 13
Time
to market, 191
parameter, 192
Tolerance design, 197
Tolerancing analysis, 211
Tools
in DCOV model, 160–61
for DFSS implementation, 217–18
in DMAIC model, 148–50
Toro, 105
Total
failure costs, 132–33
production management (TPM), 105
quality management (TQM), 1, 12
Toyota, 104
"TQM on steroids", 1
Trade secrets, 240
Training
components of strategic, 251–53
EMS, 243
just-in-time, 198
OSHA PSM regulations, 237–38
roles in, 253–60
Transformation of inputs, 54
Trial implementation, 39
Trust, 228
Turnaround time (TAT), 200
Twin Disc, 105
|